This project comprised the construction of 484 self-contained bedrooms in cluster Flats and Studio apartments over 8 storeys with D2 space and refurbished a public thoroughfare. The site, was the Former ‘Bristol Entertainment Centre, the Ice Rink was removed with the O2 Academy remaining operational throughout the works. The building was piled and rock socketed into bedrock. The main design consisted of 3 different design parameters working together.
A high SBEM calculation was set so the need for smart design on the fabric and M&E was required.
Please reach out – we’d love to hear from you.