Our Clients brief to completely strip out a the 16th Floor of and existing block and refit from CAT A to CAT B.
The works also included the reconfiguration of the 17th & 18th Floors to meet their requirements and accommodation standards.
The works consisted of a complete strip out of the redundant furniture, partitions and ceilings. We were able to reuse the doors and frames and the majority of the glass partitions.
The underfloor busbar system was replaced along with the new Cat 6 cable network, the floor boxes and lighting. New offices were constructed and new floor tiles were laid throughout.
New furniture and specialist joinery were installed for over 400 people.