B&Q. Distribution Center, Swindon
RG Group were appointed to fit out a new 360,000 sq ft Regional Consolidation Centre (RCC) for B&Q in Swindon. The works consisted of the installation of all mechanical handling equipment and associated works such as floor levelling, VNA guidance, charging areas, colleague meeting zones, sprinkler system, extract systems, installation of new coldrooms and alterations […]
Atkins Ltd. Leeds
The office refurbishment project was for a category B office fit out to Atkins ground floor and first floor offices in Leeds. The works included the full strip out and installation inclusive of mechanical and electrical goods throughout. The project was undertaken in two phases, split by floors, providing two 5 week phases, permitting continued […]
Sainsbury’s. Waltham Point Distribution Center
This project involved the fit out of a 695,000 sq.ft net distribution depot for Sainsbury’s. in addition to the fit out of Vehicle Maintenance Units and 2No. Gatehouses. The project located in Watham Point adjacent to the M25 motorway required detailed integration between the developers shell team and tenant fit-out works. The project also required […]
Sainsbury’s. 33 Holborn
This project for Sainsbury’s at their London Headquarters comprised the reconfiguration of the 8th Floor Office spaces including new Busbar and lighting and CAT 6 cable network with lift overlay to provide Destination Control, managed by interfacing with the Security system and the design and install 2 new Staircases leading from the Ground Floor Atrium […]
Catalyst Capital. Cross Street, Manchester
Appointed by Catalyst Capital, the scope was to convert 8 floors of office into grade A office including fit-out works within the basement, reception and roof area. All floors were stripped back to shell and refitted with new suspended ceilings, wall linings, raised access floors together with full new M&E installation and associated plant. New […]
Alinea Consulting. Cannon Street, London
This fast track projects was a 6750 sq ft fit out of new office space for Alinea Consulting LLP. The works took the grade A space to a fully functioning office in a 5 week period. Works included new glazed sound proof office partitions, new floor and wall finishes, modifications to raised access floor, power […]
MedicX. Prenton
RG Group, responded to an urgent phone call from MedicX to take over this partially completed project due to the financial collapse of the main contractor. Having previously developed a solid working relationship with Medicx, RG responded by having personnel on site later that day. On initial inspection it was clear there was a mixture […]
MedicX. Cambridge
RG were appointed for this private development for MedicX. The scheme involved the full refurbishment of two co-joined structures to create a a new doctors surgery and health centre, ultimately for Cambridgeshire PCT. This project represented a change of use from offices into the new practice and centre to the latest PCT health care standards. […]
Sainsbury’s Bank. Edinburgh, Lochside
The scheme was to provide the head office facilities for 800 Sainsburys Bank staff across 85,000sq ft of high quality office space over 4 floors. Initially the structure, originally constructed in 1999 was completely stripped of ceilings walls and floor finishes. We then undertook a complete refurbishment of all area. All major mechanical plant was […]
Sainsbury’s. Arndale Centre
Our Clients brief to completely strip out a the 16th Floor of and existing block and refit from CAT A to CAT B. The works also included the reconfiguration of the 17th & 18th Floors to meet their requirements and accommodation standards. The works consisted of a complete strip out of the redundant furniture, partitions […]