London City Airport Courtyard by Marriott

RG have been contracted to build a new 184 bed Courtyard by Marriott Hotel at London City Airport, Silvertown E16 2AE.

The scheme comprises CFA Piling, in-situ RC Caps and beams to substructure. The superstructure will consist of a ground floor steel frame and podium with 6 upper levels constructed in a lightweight Met Frame system with façades clad in a mix of masonry, rain screen cladding systems and glazed curtain walling with a single application membrane roof cover.

The 196-room hotel will feature a restaurant and meeting facilities on the ground floor.

The hotel is due for completion in Q2, 2020.